Structural Alterations Across the North East
Wall removals, steels, chimney work and open-plan conversions — done properly, priced in writing, finished on the agreed date.
Rushmore Developments carries out structural alterations across the North East — load-bearing wall removal, chimney breast removal and open-plan conversions, from Newcastle and Gateshead to Durham and Sunderland. Building control is handled as standard, the price is itemised in writing before work starts, and every project starts with a discovery call.
The jobs that change how a house stands up — walls out, steels in, chimney breasts removed, rooms opened into one. It's the part of building work you don't guess at: the survey tells us what the wall is carrying, the steel is sized for the span, and building control signs the work off at the end. All of it sits in our price as standard — and where a design needs formal structural calculations, that's identified at survey and named in your quote from the start.
Where the structural work is part of a bigger project — an extension, a full renovation — it sits inside the same job with the same team.
The structural work we take on
Load-bearing wall removal
the wall out, the steel in, the space opened up properly.
More details →Chimney breast removal
room by room, with the stack above made safe.
More details →Open-plan conversions
two rooms knocked into one: the kitchen-diner, the big open ground floor.
Where a project needs drawings and a planning application — an extension, a full renovation, a loft conversion or structural work — we can run the whole thing through our design and build service: architect drawings, the planning application and building regulations handled through our architect partners, then the build run by the same small team. Design & Build North East.
Not sure whether the wall you want to remove is load-bearing? Tell us what you're trying to achieve — a 15-minute call is usually enough to point you in the right direction.
Book a discovery callFive stages, and you always know where you are
Discovery call
15 minutes. What you want, what's realistic, and ballpark figures based on your project.
Book yours →Survey & written quote
We establish what the wall is carrying, then you get an itemised, fixed-scope price in writing.
Approvals
Structural work always needs building regulations approval, and we deal with building control as standard.
Build
An agreed programme, a tidy site, and the same small team — our lads plus the subcontractors we trust and use regularly — from first visit to final snag. One point of contact throughout.
Handover
The snag list is closed out before sign-off, and the completion certificate comes with the job.
Why homeowners across the North East choose Rushmore
One small team, start to finish.
The same small team — our lads plus the subcontractors we trust and use regularly — runs your job from first visit to final snag. One point of contact, no chasing a chain of trades.
Straight pricing, in writing.
Your price is itemised and fixed-scope before work starts. If anything changes, it's agreed in writing before it's charged.
Signed off, properly.
Building control is part of the job, not an extra — the paperwork that proves the work is part of the handover.
We finish what we start.
Where we work
Structural work right across the North East — Newcastle, Durham, Sunderland, Gateshead, the Tynesides and the towns between, Hebburn included.
What this service costs
Every job prices on its own scope, and we quote in writing before anything starts.
It depends on the size and nature of your project — but the prices below are a working guide. Your final quotation comes from the property you have, the work you want done and the finish that's required.
| Project | Typical range | |
|---|---|---|
| Single opening in a supporting wall | ≈ £3,000–£5,000 | More details → |
| Full knock-through | from £8,000–£12,000 | More details → |
| Chimney breast removal | from £6,000 for each room the breast passes through | More details → |
The questions people ask about structural work
Still unsure? A 15-minute call answers most of it.
Book a discovery callHow much does it cost to remove a load-bearing wall?
A single opening in a supporting wall typically runs £3,000–£5,000; a full knock-through starts at £8,000–£12,000. The span, the access and the steel size move the figure — and you get it itemised, in writing, before work starts. See our North East Structural Alterations Cost Guide for further pricing.
Do I need building regulations to remove a wall?
Yes — always, for load-bearing work — and the allowance is already in our price. Where the design needs formal structural calculations, that's identified at survey and named in your quote; nothing structural is ever priced blind, and we will not sell you a service your house doesn't need.
How do I know if a wall is load-bearing?
You don't guess — and neither do we. The survey answers it: the joist direction, what's sitting above, how the wall's built. We'll tell you what the wall is carrying before anyone talks about moving it.
How much does chimney breast removal cost?
From £6,000 for each room the breast passes through — clearing one room prices very differently to clearing the full height of the house. The written quote shows it line by line.
How long does structural work take?
A single wall opening runs to days; a full knock-through or a multi-room chimney removal runs to weeks. The programme comes in writing with your quote — agreed dates, and you're told straight if anything moves.
Can you open up the whole ground floor?
Yes — that's the open-plan conversion: the steels sized for the span, the walls out, the space made good. Bigger spans and older houses take more care in the design, and the survey tells us what your house needs before we price it.
Who actually does the work?
The same small team throughout — our own lads plus the subcontractors we trust and use regularly. You're not passed along a chain of trades: one point of contact from the survey to the last snag.
How do I get a quote — and what does it cost?
Ring us or book a discovery call — fifteen minutes about what you want and what's realistic, with ballpark figures based on your project. If it stacks up, we survey properly, and the written, itemised quote follows. The call costs nothing, the quote costs nothing.
Ready to talk about your project?
Tell us what you're planning and we'll tell you honestly what it involves and what it's likely to cost.